{"version":"1.0","provider_name":"The CT Engineering Group","provider_url":"https:\/\/www.ctengineeringgroup.com","title":"Detailed engineering, production engineering and Risk Assessment Method Statements (RAMS) for the new Australian Auxiliary Oiler Replenishment (AAOR) vessels of the Royal Australian Navy (RAN). - The CT Engineering Group","type":"rich","width":600,"height":338,"html":"
Detailed engineering, production engineering and Risk Assessment Method Statements (RAMS) for the new Australian Auxiliary Oiler Replenishment (AAOR) vessels of the Royal Australian Navy (RAN).<\/a><\/blockquote>